This project will provide new sidewalk on Ridge Road, SW, from Hillcrest Drive to Frederick Street. The approximate length of the project is 550 feet. An engineering study is being prepared to recommend on which side to build the sidewalk.
Project Details
Project Manager: Alsinia Ervin
Anticipated Construction Date: 2024
Ridge Road SW link to Engineering Study
Ridge Road SW link to 100% plans
Status Summary and Tentative Schedule
Town Council Authorization to Initiate Design | Aug. 28, 2023 |
Public Meeting to Present Design | February 2024 |
Town Council Approval of Final Design Concept | Spring 2024 |
Town Council Approval of Construction Contract | Summer 2024 |